Navigation:
Home >
Products >
Galvanic Anodes >
Anode - Accessories
Adair
REDHEAD®
&
BLUEHEAD®
Heater Treater
Anode
Mounting Heads

One-piece, high-temperature, flame-retarding, high
compression
molded fiberglass anode mounting heads


The REDHEAD®
Built for maximum life in even the harshest
of environments, the Redhead® is designed with four integral ribs that
insure easy installation, optimal internal alignment and maximum andode
stability.
- The Redhead®
is designed with four integral support ribs for skids for easy installation,
proper alignment and superior in-flow anode stability.
- Installs in standard 4-inch (100 mm) Schedule 40
fittings with standard grooved with
Victaulic* couplings.
- Effectively supports anodes of up to 3
inch (76 mm) diameter with a maximum length of 60 inches (1.52 m).
- Over 15 years of proven service in the field.
|
 |
The BLUEHEAD ®
Built to the same exacting standards as the
Redhead®, the Bluehead® is engineered to withstand the most severe of
heater treater environments. Four integral stabilization ribs make for
fast and easy installation, optimal alignment and maximum anode
stability.
- The Bluehead® is designed for mounting
in (4") four inch (100 mm), Schedule 80 fittings with standard grooved
Victaulic* couplings.
- Effectively supports anodes of up to 3
inch (76 mm) diameter with a maximum length of 60 inches (1.52 m).
|
 |

General
Assembly Instructions
Parts
Required for Graphite Anodes
1 Anode, 3” (7.5 cm)
maximum diameter
1 RED HEAD or BLUE HEAD
1 ¾” Std. Thread Stud, Cad Plated
1 ¾“ Std. Thread Half-Nut, Cad Plated
1 ¾“ Std. Thread Nut, Cad Plated
1 ¾“ Flat Washer, Cad Plated
Approx. 6 oz (170 gm) hi-temp epoxy or polyester
based adhesive mixed to a heavy paste-like
consistency.
Installation
-
Before mixing adhesive,
slide Red Head over anode. Do not use force. Red
Head should slide smoothly over anode with about
1/32” (0.5-1.0 mm) annular clearance. If Red Head
fits tight check anode for rough spots and machine
or file as necessary to assure proper fit.
-
Drill and tap anode
approx. 6” (15.5 cm) deep for ¾“ stud. Note: Anode
should be impregnated with proper linseed oil at
least 24 hours prior to mounting of Red Head.
-
Screw ¾“ stud tightly
into anode. Run half-nut down onto stud.
-
With acetone, clean
stud, nut and anode down approx. 7” (18 cm) from
top.
-
Mix adhesive and apply
thin coat onto diameter of anode down approx. 7” (18
cm) from the top. Then apply ¾“ (2 cm) thick amount
of adhesive to the top of the anode. Slide Red Head
over stud and anode.
-
Install flat washer and
nut and tighten. This will force adhesive down and
around anode and also up and around stud and flat
washer.
-
Allow sufficient time
for adhesive to cure, then pressure test complete
unit with at least 80 psi water pressure.
Parts
Required for Metal Anodes
1 Anode, 3” (7.5 cm)
maximum diameter
1 RED HEAD or BLUE HEAD
1 ¾“ Std. Thread Nut, Cad Plated
1 ¾“ Flat Washer, Cad Plated
Approx. 6 oz (170 gm) hi-temp epoxy or polyester
based adhesive mixed to a heavy paste-like
consistency.
Installation
-
Before mixing adhesive,
slide Red Head over anode. Do not use force. Red
Head should slide smoothly over anode with about
1/32” (0.5-1.0 mm) annular clearance. If Red Head
fits tight check anode for rough spots and machine
or file as necessary to assure proper fit.
-
Mix adhesive and apply
thin coat onto diameter of anode down approx. 7” (18
cm) from the top. Then apply ¾“ (2 cm) thick amount
of adhesive to the top of the anode. Slide Red Head
over stud and anode.
-
Install flat washer and
nut and tighten. This will force adhesive down and
around anode and also up and around stud and flat
washer.
-
Allow sufficient time
for adhesive to cure, then pressure test complete
unit with at least 80 psi water pressure.
|
|